h
Australasian Projects

PROJECTS AUSTRALASIA

Typical Lakeside Cooling Towers projects over the recent years.

 

Victoria University
Model
Melbourne
MA30
Type Induced draft counter-flow
Duty 35°C / 29.5° / 22°
Application Air-conditioning
Material Fibreglass
Date of Inst. December 2002
     
National Foods Ltd
Model
Melbourne
MA18/3S
national foods
Type Induced draft counterflow
Duty 37°C / 32° / 27°
Application Specialized Milk Products
Material 304 Stainless body. FRP fandeck/cylinder
Date of Inst. March 2003  
Replacement Reasons Energy efficiency
Maintenance and serviceability
Occupational health and safety requirement
Mechanical superiority (direct VFD)
 

   
Santos
Model
Moomba Gas Fields, South Australia
700DF x 3
Type Cross flow
Duty 53°C / 35° / 22°
Application Flash Evaporator - Moomba Gasfields - S.A.
Material Steel Frame - 316 stainless lathes
Date of Inst. October 2000
     
Alcoa
Model
Wagerup Refinery, Western Australia
WM4003S
Type Counterflow
Duty 50°C / 32° / 24°
Application Heat Exchanger - Wagerup Refinery - W.A.
Material Timber
Date of Inst. September 1996  
     
Data-Air
Model
Lonsdale St., Melbourne
MA 18/6
Type Counterflow
Duty 36°C / 29° / 22°
Application Air-conditioning at Lonsdale St Melbourne
Material FRP
Date of Inst. October 2000
     
Comalco
Model
Boyne Island, Queensland
2DF1560
Type Cross flow
Duty 40°C / 33° / 26°
Application Boyne Island Aluminium Smelter - QLD.
Material Timber
Date of Inst. June/July 1996
     
Stericlean Linen Service
Model
Austin Hospital, Melbourne
MA 18/9
Type Counterflow
Duty 36°C / 28° / 21°
Application Austin Hospital / Laundry Waste Cooling
Material FRP
Date of Inst. July 1999
     
Olympic Dam Exp. Project
Model
Roxby Downs, South Australia
DF 1560
Type Crossflow
Duty 56°C / 34° / 29.5°
Application Copper and Uranium Mining - Roxby Downs - S.A.
Material Timber
Date of Inst. July 1999
     
AMRL
Model
Melbourne
WM4002S
Type Counterflow
Duty 39°C / 29.5° / 21°
Application Wind Tunnel Project - Melbourne
Material Timber
Date of Inst. November 1996
     
Comalco
Model
Bell Bay, Tasmania
2VDA 207812 - Refurbishment (installed 1972)
Type Crossflow
Application Aluminium Smelting
Material Timber
Date of Refurbishment. November 1994
     
Rendertech Ltd
Model
Pakenham, Victoria
RCF 500
Type Counterflow
Duty 45°C / 28° / 22°
Application Meat Processing Plant - Pakenham
Material FRP
Date of Inst. July 1997
     
Australian Char
Model
Morwell, Victoria, Australia
VDA 10587
Type Crossflow
Duty 55°C / 35° / 22°
Application Char Plant - Morwell
Material Timber frame / FRP casing / Stainless lathes
Date of Inst. June 1998
 
World Oasis
Model
Singapore
MA30/3
Type Counterflow
Duty 62°C / 40° / 27°
Application Special High-Efficiency Waste Recovery System - Singapore
Material FRP
Date of Inst. May 2001
 
Apex Fenner
Model

Melbourne, Australia
MA18/6

MA18 Apex Fenner
Type

Induced draft counter-flow

Duty

35°C / 29.5° / 22°

Application

Rubber extrusion

Material

Fiberglass

Date of Inst.

August 2004

 
Goodyear Belting
Model

Melbourne, Australia
MA24/9

MA24 Goodyear
Type

Induced draft counter-flow

Duty

35°C / 29.5° / 22°

Application

Rubber extrusion

Material

Fiberglass

Date of Inst.

October 2003

 
Tridonic Atco
Model

Melbourne, Australia
MA18/6

MA18 Tridonic Atco
Type

Induced draft counter-flow

Duty

32°C / 27° / 22°

Application

Copper Wire Manufacturing

Material

Fiberglass

Date of Inst.

December 2005

 
Bulloo Shire Council
Model

Thargomindah, Queensland
2MA40/6

2MA40 Bulloo Shire Council
Type

Induced draft counter-flow

Duty

40°C / 25° / 22°

Application

Bore Water Cooling

Material

Fiberglass

Date of Inst.

July 2006

 
Go Top

Return to main Clients page - Go to Clients MENA

What did our clients need?
A solution which was economically sound, a design which met with their application and site requirements, project support which acknowledged the strengths of their in-house expertise.

What we provided for them.
We provided our expertise through diagnosis and evaluation, designing solutions for their cooling tower application.

Our track record speaks for itself.

We have provided many turnkey operations, including:

Cooling Tower Manufacturing (Custom)

Plant Equipment design

Pump sizing & selection

Plumbing installation

Light engineering

What distinguishes our assembly process?
Lakeside’s unique design features, incorporated in all it’s towers, allow assembly and installation of all equipment quickly and efficiently, ensuring clients lose as little operational time as possible. The MA range, in particular, normally requires site assembly time of between 4 hours and one day.

VDA/DF installation at
the Olympic Dam
Vinidex Plastics, Victoria

Lakeside Cooling Towers manufactures to ISO 9001 standards enabling us to control each project, maintain good communication with the client and never loose sight of their needs.

 

Go Top

Lakeside Cooling Towers

Lakeside Cooling Towers (Australasia) Pty Ltd
3/198 Whitehorse Rd
Blackburn VIC 3130
Australia
Telephone:+61 03 9877 5066
Facsimile:+61 03 9877 5177
Email: info@lakesidect.com.au

Go Top
 

 

Copyright 2000 Lakeside Cooling Towers (Australasia) Pty Ltd.  All Rights Reserved.