PROJECTS MENA
|
Typical
Lakeside Cooling Towers projects over the recent years.

|
Dubai
Aluminium
Model |
U.A.E.
MA40/9 |
 |
| Type |
Induced
draft counterflow |
| Duty |
58°C
/ 38° / 33° |
| Application |
Cast
House Smelting |
| Material |
HDG
Framework with FRP panels and fandeck/cylinder |
| Date
of Inst. |
April
2002 |
|
| Replacement
Reasons |
Energy
efficiency
Maintenance and serviceability
Occupational health and safety requirement
Mechanical superiority (direct VFD) |
 |
| |
|
|
|
|
|
|
Sensaire
Model |
Khartoum,
Sudan
MA36/9 |
 |
| Type |
Counterflow |
| Duty |
34.94°C
/ 26.66° / 23° |
| Application |
Sudan
Superannuation Building Air-Conditioning Application Khartoum |
| Material |
FRP |
| Date
of Inst. |
March
2001 |
|
|
MA36/9
Factory Assembled |
Al Zarabi Trading EST.
Model |
Riyadh, Saudi Arabia
MA36/3 |
 |
| Type |
Induced draft counterflow |
| Duty |
32°C / 28° / 23° |
| Application |
Sulphur Factory |
| Material |
HDG
Framework with FRP panels and fandeck/cylinder |
| Date
of Inst. |
October 2004 |
|
|
|
Al Jaber
Model |
Abu Dhabi
4 x MA 18/6 |
 |
| Type |
Induced draft counterflow |
| Duty |
40°C / 32° / 29° |
| Application |
Aluminium/Plastic bonding |
| Material |
HDG
Framework with FRP panels and fandeck/cylinder |
| Date
of Inst. |
December 2004 |
|
|
|
DVD.
Model |
Ras Al Khaima
2-2MA40/9 |
 |
| Type |
Induced draft counterflow |
| Duty |
39.4°C / 34° / 30° |
| Application |
DVD Manufacturing Plant |
| Material |
HDG
Framework with FRP panels and fandeck/cylinder |
| Date
of Inst. |
May 2005 |
|
|
Return to main Clients page - Go to Clients Australasia
What did our clients need?
A solution which was economically sound, a design which met with their
application and site requirements, project support which acknowledged
the strengths of their in-house expertise.
What we provided for them.
We provided our expertise through diagnosis and evaluation, designing
solutions for their cooling tower application.
Our track record speaks for itself.
We have provided many turnkey operations,
including:
Cooling Tower Manufacturing (Custom)
Plant Equipment design
Pump sizing & selection
Plumbing installation
Light engineering
What distinguishes our assembly process?
Lakeside's unique design features, incorporated in all it's
towers, allow assembly and installation of all equipment quickly and efficiently,
ensuring clients lose as little operational time as possible. The MA range,
in particular, normally requires site assembly time of between 4 hours
and one day.
|
|
|
|
Two twin unit installations of the MA40/6 |
Sulphur
Factory, Riyadh |
Lakeside Cooling Towers manufactures
to ISO 9001 standards enabling us to control each project, maintain good
communication with the client and never loose sight of their needs.
|