MENA Projects
Mid East - North Africa

PROJECTS MENA

Typical Lakeside Cooling Towers projects over the recent years.

 

Dubai Aluminium
Model
U.A.E.
MA40/9
Type Induced draft counterflow
Duty 58°C / 38° / 33°
Application Cast House Smelting
Material HDG Framework with FRP panels and fandeck/cylinder
Date of Inst. April 2002  
Replacement Reasons Energy efficiency
Maintenance and serviceability
Occupational health and safety requirement
Mechanical superiority (direct VFD)
     

   
Sensaire
Model
Khartoum, Sudan
MA36/9
Type Counterflow
Duty 34.94°C / 26.66° / 23°
Application Sudan Superannuation Building Air-Conditioning Application Khartoum
Material FRP
Date of Inst. March 2001

  MA36/9 Factory Assembled
Al Zarabi Trading EST.
Model

Riyadh, Saudi Arabia
MA36/3

Sulphur factory
Type Induced draft counterflow
Duty 32°C / 28° / 23°
Application Sulphur Factory
Material HDG Framework with FRP panels and fandeck/cylinder
Date of Inst. October 2004

   
Al Jaber
Model
Abu Dhabi
4 x MA 18/6
Ajecobond
Type Induced draft counterflow
Duty 40°C / 32° / 29°
Application Aluminium/Plastic bonding
Material HDG Framework with FRP panels and fandeck/cylinder
Date of Inst. December 2004

   
DVD.
Model

Ras Al Khaima
2-2MA40/9

DVD
Type Induced draft counterflow
Duty 39.4°C / 34° / 30°
Application DVD Manufacturing Plant
Material HDG Framework with FRP panels and fandeck/cylinder
Date of Inst. May 2005
Go Top

Return to main Clients page - Go to Clients Australasia

What did our clients need?
A solution which was economically sound, a design which met with their application and site requirements, project support which acknowledged the strengths of their in-house expertise.

What we provided for them.
We provided our expertise through diagnosis and evaluation, designing solutions for their cooling tower application.

Our track record speaks for itself.

We have provided many turnkey operations, including:

Cooling Tower Manufacturing (Custom)

Plant Equipment design

Pump sizing & selection

Plumbing installation

Light engineering

What distinguishes our assembly process?
Lakeside's unique design features, incorporated in all it's towers, allow assembly and installation of all equipment quickly and efficiently, ensuring clients lose as little operational time as possible. The MA range, in particular, normally requires site assembly time of between 4 hours and one day.

Two twin unit installations of the MA40/6
Sulphur Factory, Riyadh

Lakeside Cooling Towers manufactures to ISO 9001 standards enabling us to control each project, maintain good communication with the client and never loose sight of their needs.

 

Go Top

Lakeside Cooling Towers

Lakeside Cooling Towers (Australasia) Pty Ltd
3/198 Whitehorse Rd
Blackburn VIC 3130
Australia
Telephone:+61 03 9877 5066
Facsimile:+61 03 9877 5177
Email: info@lakesidect.com.au

Go Top
 

 

Copyright 2000 Lakeside Cooling Towers (Australasia) Pty Ltd.  All Rights Reserved.