Typical Lakeside Cooling Towers projects over the recent years.

 

Dubai Aluminium
Model
U.A.E.
MA40/9
Type Induced draft counterflow
Duty 58°C / 38° / 33°
Application Cast House Smelting
Material HDG Framework with FRP panels and fandeck/cylinder
Date of Inst. April 2002 Standard vs. new MA Range
Replacement Reasons Energy efficiency
Maintenance and serviceability
Occupational health and safety requirement
Mechanical superiority (direct VFD)
     

   
Sensaire
Model
Khartoum, Sudan
MA36/9
Type Counterflow
Duty 34.94°C / 26.66° / 23°
Application Sudan Superannuation Building Air-Conditioning Application Khartoum
Material FRP
Date of Inst. March 2001

  MA36/9 Factory Assembled
Al Zarabi Trading EST.
Model

Riyadh, Saudi Arabia
MA36/3

Sulphur factory
Type Induced draft counterflow
Duty 32°C / 28° / 23°
Application Sulphur Factory
Material HDG Framework with FRP panels and fandeck/cylinder
Date of Inst. October 2004

   
Al Jaber
Model
Abu Dhabi
4 x MA 18/6
Ajecobond
Type Induced draft counterflow
Duty 40°C / 32° / 29°
Application Aluminium/Plastic bonding
Material HDG Framework with FRP panels and fandeck/cylinder
Date of Inst. December 2004

   
Falcon Technologies International.
Model

Ras Al Khaima
2-2MA40/9

DVD
Type Induced draft counterflow
Duty 39.4°C / 34° / 30°
Application DVD Manufacturing Plant
Material HDG Framework with FRP panels and fandeck/cylinder
Date of Inst. May 2005

   
Greenpower
Model

Bahrain
3-2 MA40/9

DVD
Type Induced draft counterflow
Duty 40°C / 32° / 29°
Application Ethanol production
Material HDG Framework with FRP panels and fandeck/cylinder
Date of Inst. May 2006

   
BG University
Model

Israel
2 MA4048/9

DVD
Type Induced draft counterflow
Duty 35°C / 29.5° / 25°
Application Chiller cooling
Material HDG Framework with FRP panels and fandeck/cylinder
Date of Inst. November 2008
     

Return to main Clients page - Go to Clients Australasia

What did our clients need?
A solution which was economically sound, a design which met with their application and site requirements, project support which acknowledged the strengths of their in-house expertise.

What we provided for them.
We provided our expertise through diagnosis and evaluation, designing solutions for their cooling tower application.

Our track record speaks for itself.

We have provided many turnkey operations, including:

Cooling Tower Manufacturing (Custom)

Plant Equipment design

Pump sizing & selection

Plumbing installation

Light engineering

What distinguishes our assembly process?
Lakeside’s unique design features, incorporated in all it’s towers, allow assembly and installation of all equipment quickly and efficiently, ensuring clients lose as little operational time as possible. The MA range, in particular, normally requires site assembly time of between 4 hours and one day.

Two twin unit installations of the MA40/6
Sulphur Factory, Riyahd

Lakeside Cooling Towers manufactures to ISO 9001 standards enabling us to control each project, maintain good communication with the client and never loose sight of their needs.

 

Go Top

Lakeside Cooling Towers

Lakeside Cooling Towers (Australasia) Pty Ltd
6 / 126-134 Fairbank Rd.
Clayton South, VIC. 3169
Australia
Telephone:+61 3 9558 0733
Facsimile:+61 3 9558 0788
Email: info@lakesidect.com.au

Go Top
 

 

Copyright 2000 Lakeside Cooling Towers (Australasia) Pty Ltd.  All Rights Reserved.